A52 Clifton Bridge repair scheme – August 2021 newsletter


August 9th, 2021

The new edition of Highways England’s newsletter to help keep people up-to-date with the latest information about the A52 Clifton Bridge repair scheme is now available.

The main updates include:

Overnight closures
A52 Clifton Bridge Eastbound (towards Grantham)
The overnight closures will be on: August: 5, 6, 7, 9, 10, 11, 12, 13 and 14, from 20:00 to 06:00.

Altering the Traffic Management
A52 Clifton Bridge east, overnight on Saturday 7 August (weather permitting).

  • From 6am Sunday 8 August, the live lanes will have switched
  • Currently: lanes 1 and 2 are live, with lanes 3 and 4 closed.
  • From Sunday: lanes 3 and 4 will be live, with lanes 1 and 2 closed.
  • This will mean a change of lane discipline at the A433 junction. After the switch, traffic for the A453 will continue in the same lane. While traffic remaining on the A52, will need to change lanes, following the directional signs.

To catch up on all of the updates, you can read the full August 2021 edition of the Clifton Bridge Newsletter here.

Tags: , , , ,

Leave a Reply

Other

Need news? See you on SharePoint

After 14 years of service, Campus News is being retired as the university’s staff news platform.  […]

Roads and car parks closed for refurbishing work

As part of ongoing road improvements at the university, works will be taking place to resurface […]