*PLEASE NOTE: ARTICLE UPDATED WITH NEW ACCESS POINTS*

Coates Building Entrance 2 — the main entrance to the Coates reception and Coates Café — will be temporarily closed from Monday 24 July while construction work is undertaken on the new Coates Road Canopy.

Entrance 2 will remain closed throughout the summer and will reopen on Thursday 14 September.

During the construction period, the following alternative entrances can be used to gain access to the Coates reception and Café:

  • The Coates reception area can be accessed via the Pope Building
  • The Coates Café can be accessed via Coates Building Entrance 3, the L2 Building and the Engineering Science Learning Centre

Five parking spaces near to Coates Road (in the site compound adjacent to the L2 Building) will be unavailable throughout the duration of the construction work, however parking will be otherwise unaffected.

View a map of the construction works and affected spaces.

Tags: , , , , ,

2 Comments

July 20th, 2017 at 10:20 am

David Palmer

What is the access point for out-of-hours? Since it is currently Entrance 2, via reception

July 20th, 2017 at 1:20 pm

brzrcb1

Hi David. There is a card reader located by Entrance 1 — this can be used to provide out-of-hours access. Kind regards, Becky

Leave a Reply

Other

Research strategy and research culture – invitation to find out more

An update from Professor Dame Jessica Corner Colleagues are invite to find out more about progress […]

Stick to Science: open letter sent to EU Commission calling for intervention

Signatories of the Stick to Science campaign have sent an open letter to the President of […]